Men’s Musalla Renovations – New Carpet Arrives as We Prepare for Fitting

Written by Admin on . Posted in .

Bismillāh wal-hamdulillāh.

Update, 26 October: fitting underway

Alhamdulillāh, the fitting of the new carpet is now underway. The old carpet has been cut and lifted in strips, and the underlay beneath it cleared, so that the floor can be prepared for the new carpet.

  • Walking along the old carpet as the work begins.

  • A seam in the old carpet opened along its length.

    A seam in the old carpet opened along its length.

  • A strip of the old carpet peeled back to show the underlay.

    A strip of the old carpet peeled back to show the underlay.

  • The old carpet cut into strips and lifted along the musallā.

    The old carpet cut into strips and lifted along the musallā.

  • More of the old carpet lifted, with the underlay exposed.

    More of the old carpet lifted, with the underlay exposed.

    With the old carpet up, the underlay was cleared to show the original floor beneath it. By midday the musallā was fully stripped back, and the new underlay had been delivered, ready to be laid.

    • The underlay uncovered by the entrance doors.

      The underlay uncovered by the entrance doors.

    • The underlay cleared to show the old floor tiles beneath.

      The underlay cleared to show the old floor tiles beneath.

    • The musallā with its old carpet lifted and the underlay coming up.

      The musallā with its old carpet lifted and the underlay coming up.

    • The old floor uncovered as the last of the underlay is rolled up.

      The old floor uncovered as the last of the underlay is rolled up.

    • The musallā fully stripped back, ready for the new carpet.

      The musallā fully stripped back, ready for the new carpet.

    • The new underlay, delivered and ready to be laid.

      The new underlay, delivered and ready to be laid.

      In the afternoon, the new underlay was laid across the whole musallā.

      • The new underlay rolls brought into the stripped musallā.

        The new underlay rolls brought into the stripped musallā.

      • The new underlay going down over the old floor.

        The new underlay going down over the old floor.

      • Walking across the new underlay, laid over the whole musallā.

        With the underlay down, the new carpet is next, completing the final stage of the men’s musallā renovation, in shā Allāh. We thank Allāh, then everyone who has supported the work, and we look forward to sharing the finished musallā with you soon.


        22 October: the new carpet arrives

        Alhamdulillāh, the new carpet arrived at the Salafi Centre on 19 October, and the rolls are now on site ready for fitting.

        • The new carpet rolls in the delivery vehicle.

          The new carpet rolls in the delivery vehicle.

        • One new roll inside the musalla.

          One new roll inside the musalla.

        • The carpet rolls stored after delivery.

          The carpet rolls stored after delivery.

          The existing carpet is worn and frayed in several places, with sections patched over time. The photographs show its condition before replacement, alongside the new carpet brought inside and ready for the next stage.

          • A close view of wear in the old carpet.

            A close view of wear in the old carpet.

          • The worn section of old carpet in context.

            The worn section of old carpet in context.

          • The original carpet across the musalla before fitting.

            The original carpet across the musalla before fitting.

            Fitting the new carpet will bring this final stage of the men’s musalla renovation together, in shā Allāh.

            Alhamdulillāh, the carpet-fitting appeal has reached its target. We thank Allāh, then everyone who donated and helped with the delivery and preparations.

            We look forward to sharing the completed carpet once fitting has taken place, in shā Allāh. Bārak-Allāhu-Fīkum.

            Men’s musallā transformation

            Step 1 of 3

            Choose your donation Choose your monthly donation

            Make a one-off donation. Give a regular amount that is comfortable for you.

            Payments securely processed by Stripe

            Related posts

            Announcements Projects & Maintenance

            Men’s Musalla Renovations – Tiling, Coving and Lighting Take Shape

            Alhamdulillāh, this week has seen some amazing progress, including:

            • Large-format porcelain tiling in the Musalla
            • Wall preparation and painting
            • New warm spotlights and lighting upgrades
            • Moroccan-style backlit ceiling panels
            • New coving and ceiling works
            • Electrical upgrades and new sockets
            • Power and audio cables being concealed to reduce clutter and trip hazards

            This has been possible by the permission of Allah, and then your generous deonations. E𝘃𝗲𝗿𝘆 𝗰𝗼𝗻𝘁𝗿𝗶𝗯𝘂𝘁𝗶𝗼𝗻, 𝗻𝗼 𝗺𝗮𝘁𝘁𝗲𝗿 𝗵𝗼𝘄 𝘀𝗺𝗮𝗹𝗹, 𝗵𝗲𝗹𝗽𝘀 𝘂𝘀 𝗺𝗼𝘃𝗲 𝗰𝗹𝗼𝘀𝗲𝗿 𝘁𝗼 𝗰𝗼𝗺𝗽𝗹𝗲𝘁𝗶𝗼𝗻.

            The Prophet ﷺ said:

            > “𝗪𝗵𝗼𝗲𝘃𝗲𝗿 𝗯𝘂𝗶𝗹𝗱𝘀 𝗮 𝗺𝗼𝘀𝗾𝘂𝗲 𝗳𝗼𝗿 𝗔𝗹𝗹𝗮𝗵, 𝗔𝗹𝗹𝗮𝗵 𝘄𝗶𝗹𝗹 𝗯𝘂𝗶𝗹𝗱 𝗳𝗼𝗿 𝗵𝗶𝗺 𝗮 𝗵𝗼𝘂𝘀𝗲 𝗹𝗶𝗸𝗲 𝗶𝘁 𝗶𝗻 𝗣𝗮𝗿𝗮𝗱𝗶𝘀𝗲.” [Bukhārī & Muslim]

            🔗 https://salaficentre.org/projects-maintenance/mens-musalla-renovations-amazing-progress/

            𝗖𝗼𝗻𝘁𝗶𝗻𝘂𝗲 𝘁𝗼 𝘀𝘂𝗽𝗽𝗼𝗿𝘁 𝘁𝗵𝗲 𝗽𝗿𝗼𝗷𝗲𝗰𝘁 𝗮𝗻𝗱 𝘀𝗵𝗮𝗿𝗲 𝗶𝗻 𝘁𝗵𝗲 𝗿𝗲𝘄𝗮𝗿𝗱.

            Bārak-Allāhu fīkum.