Skip to main content

Men’s Musalla Renovations – The New Carpet Goes Down

Written by Admin on . Posted in .

Bismillāh wal-hamdulillāh.

26 October: the new carpet goes down

Alhamdulillāh, with the new underlay laid across the men’s musallā, the fitters began laying the new carpet on the afternoon of 26 October. The first roll went down over the underlay, and each width was then laid beside the last.

  • The first roll of the new carpet going down over the new underlay.

    The first roll of the new carpet going down over the new underlay.

  • The first roll from the side, as it is unrolled.

    The first roll from the side, as it is unrolled.

  • The first widths laid down the length of the musallā.

    The first widths laid down the length of the musallā.

  • A new width unrolled beside the first.

    A new width unrolled beside the first.

    By the evening, the prayer rows were taking shape across the whole room.

    • The prayer rows taking shape across the whole musallā.

      The prayer rows taking shape across the whole musallā.

    • The new rows running towards the door.

      The new rows running towards the door.

    • The new rows along the side wall.

      The new rows along the side wall.

    • The new rows by the door, with the fitters’ tools and spare underlay.

      The new rows by the door, with the fitters’ tools and spare underlay.

    • Walking along the new rows as they are vacuumed.

      Where two widths of carpet meet, they are joined over seaming tape.

      • A seam folded back, showing the tape that joins the widths.

        A seam folded back, showing the tape that joins the widths.

      • The seaming tape beneath a row line.

        The seaming tape beneath a row line.

      • A row line lifted over the seaming tape beneath it.

        A row line lifted over the seaming tape beneath it.

        We thank Allāh, then everyone who has supported the work. Photographs of the finished musallā will follow here soon, in shā Allāh. Bārak-Allāhu fīkum.

        The earlier updates, from the new carpet’s arrival to the old carpet coming up and the new underlay going down, are in the previous post.

        Help Maintain Salafi Centre

        Step 1 of 3

        Choose your donation Choose your monthly donation

        Make a one-off donation. Give a regular amount that is comfortable for you.

        Payments securely processed by Stripe

        Related posts

        Announcements Projects & Maintenance

        Men’s Musalla Renovations – Tiling, Coving and Lighting Take Shape

        Alhamdulillāh, this week has seen some amazing progress, including:

        • Large-format porcelain tiling in the Musalla
        • Wall preparation and painting
        • New warm spotlights and lighting upgrades
        • Moroccan-style backlit ceiling panels
        • New coving and ceiling works
        • Electrical upgrades and new sockets
        • Power and audio cables being concealed to reduce clutter and trip hazards

        This has been possible by the permission of Allah, and then your generous deonations. E𝘃𝗲𝗿𝘆 𝗰𝗼𝗻𝘁𝗿𝗶𝗯𝘂𝘁𝗶𝗼𝗻, 𝗻𝗼 𝗺𝗮𝘁𝘁𝗲𝗿 𝗵𝗼𝘄 𝘀𝗺𝗮𝗹𝗹, 𝗵𝗲𝗹𝗽𝘀 𝘂𝘀 𝗺𝗼𝘃𝗲 𝗰𝗹𝗼𝘀𝗲𝗿 𝘁𝗼 𝗰𝗼𝗺𝗽𝗹𝗲𝘁𝗶𝗼𝗻.

        The Prophet ﷺ said:

        > “𝗪𝗵𝗼𝗲𝘃𝗲𝗿 𝗯𝘂𝗶𝗹𝗱𝘀 𝗮 𝗺𝗼𝘀𝗾𝘂𝗲 𝗳𝗼𝗿 𝗔𝗹𝗹𝗮𝗵, 𝗔𝗹𝗹𝗮𝗵 𝘄𝗶𝗹𝗹 𝗯𝘂𝗶𝗹𝗱 𝗳𝗼𝗿 𝗵𝗶𝗺 𝗮 𝗵𝗼𝘂𝘀𝗲 𝗹𝗶𝗸𝗲 𝗶𝘁 𝗶𝗻 𝗣𝗮𝗿𝗮𝗱𝗶𝘀𝗲.” [Bukhārī & Muslim]

        🔗 https://salaficentre.org/projects-maintenance/mens-musalla-renovations-amazing-progress/

        𝗖𝗼𝗻𝘁𝗶𝗻𝘂𝗲 𝘁𝗼 𝘀𝘂𝗽𝗽𝗼𝗿𝘁 𝘁𝗵𝗲 𝗽𝗿𝗼𝗷𝗲𝗰𝘁 𝗮𝗻𝗱 𝘀𝗵𝗮𝗿𝗲 𝗶𝗻 𝘁𝗵𝗲 𝗿𝗲𝘄𝗮𝗿𝗱.

        Bārak-Allāhu fīkum.