Salafi Centre Renovation Update: Bookcases Removed, Walls Prepared and Brickwork to Be Rebuilt

Written by Salafi Centre on . Posted in .

Alḥamdulillāh, work continues to move forward at the Salafi Centre as we prepare for the next stage of the renovation.

  • Bookcases removed, exposing the wall beneath the windows.

  • The weakened section taken out, down to the brickwork.

  • Walls scored ready for the tile adhesive.

    ✅ Bookcases Removed
    The bookcases have now been removed, giving us full access to the walls ready for the upcoming tiling works.

    ✅ Preparing the Walls
    The walls are currently being scored and prepared to ensure the tile adhesive bonds securely and provides a long-lasting finish.

    ✅ Unexpected Discovery
    As the timber ledges beneath the windows were removed, we discovered that part of the wall behind them had deteriorated and was much weaker than expected.

    Qadar Allah, there was no option but to remove the weakened section. This has now exposed the brickwork and the area will be rebuilt by a professional bricklayer before the tiling work can continue.

    Whilst these kinds of unexpected issues can sometimes arise during renovation projects, it’s always better to identify and rectify them properly rather than simply covering them up.

    ✅ Built to Last
    We’re committed to doing the job properly from start to finish, with professional tradesmen carrying out each stage of the work to ensure a safe, durable and high-quality result.

    Jazākumullāhu khayran to everyone who continues to support the ongoing improvements at the Salafi Centre. Your duʿāʾ and support are greatly appreciated.

    Further updates coming soon, in shāʾ Allāh.

    Help Maintain Salafi Centre

    Step 1 of 3

    Choose your donation Choose your monthly donation

    Make a one-off donation. Give a regular amount that is comfortable for you.

    Payments securely processed by Stripe